1.1.f Loop Guard

Task 1
Configure the switches according to the diagram. The unused ports should be configured in the administratively down state:

Task 2
Configure the F0/23 interface of SW3 such that if it does not receive BPDUs from SW2’s F0/23 interface, Layer 2 loops do not occur.